nieuwe zoekopdracht
[ meld een fout in dit record ]mandje (0): toevoegen | toon Print deze pagina

Initiating and upscaling mussel reef establishment with life cycle informed restoration: Successes and future challenges
Temmink, R.J.M.; Fivash, G.S.; Govers, L.L.; Nauta, J.; Marín Díaz, B.; Cruijsen, P.M.J.M.; Didderen, K.; Penning, E.; Olff, H.; Heusinkveld, J.H.T.; Lamers, L.P.M.; Lengkeek, W.; Christianen, M.J.A.; Reijers, V.C.; Bouma, T.J.; van der Heide, T. (2022). Initiating and upscaling mussel reef establishment with life cycle informed restoration: Successes and future challenges. Ecol. Eng. 175: 106496. https://dx.doi.org/10.1016/j.ecoleng.2021.106496

Bijhorende data:
In: Ecological Engineering. Elsevier: Amsterdam; London; New York; Tokyo. ISSN 0925-8574; e-ISSN 1872-6992, meer
Peer reviewed article  

Beschikbaar in  Auteurs 

Trefwoord
    Mytilus edulis Linnaeus, 1758 [WoRMS]
Author keywords
    Blue mussel; Mytilus edulis; Facilitation; BESE; Substrate; Establishment; Mussel beds

Auteurs  Top 
  • Temmink, R.J.M., meer
  • Fivash, G.S.
  • Govers, L.L., meer
  • Nauta, J.
  • Marín Díaz, B., meer
  • Cruijsen, P.M.J.M.
  • Didderen, K.
  • Penning, E., meer
  • Olff, H.
  • Heusinkveld, J.H.T.
  • Lamers, L.P.M.
  • Lengkeek, W.
  • Christianen, M.J.A.
  • Reijers, V.C.
  • Bouma, T.J., meer
  • van der Heide, T., meer

Abstract

    Worldwide, coastal ecosystems are rapidly degrading in quality and extent. While novel restoration designs include facilitation to enhance restoration success in stressful environments, they typically focus on a single life-stage, even though many organisms go through multiple life-stages accompanied by different bottlenecks. A new approach – life cycle informed restoration – was designed to ameliorate multiple bottlenecks throughout an organism's life cycle. It has successfully been tested on a small scale to facilitate intertidal bivalve reef formation in the Netherlands and Florida. Yet, it remains unknown whether this approach can be scaled to ecosystem-relevant scales. To test whether life cycle informed restoration is upscalable, we conducted a large-scale restoration experiment using blue mussel reefs as a model system. In our experiment, we used biodegradable structures to temporarily facilitate mussel reef formation by providing early-life settlement substrates, and subsequently, reduce post-settlement predation on an intertidal flat in the Wadden Sea, the Netherlands. The structures were placed in 10 × 20 m plots, mimicking bands found in natural mussel beds, spread out across 650 m, and were followed for two years. Ourresults show that the structures enhance mussel biomass (0.7 ± 0.2 kg DW m −2), as mussels were absent in bare plots. However, biomass varied within plots; in intact structures it was 60 times higher (1.2 ± 0.2 kg DW m−2) than in those that became buried (0.02 ± 0.009 kg DW m−2). Next to burial, 18–46% of the structures were lost due to technical failure, especially during winters at this exposed site. We show that the life cycle informed restoration principle works, but we encountered technical challenges due to larger scale processes (e.g. sedimentation). Furthermore, environmental information is essential for site selection, and for restoration, the functioning of such structures should be tested under extreme conditions before upscaling.


Alle informatie in het Integrated Marine Information System (IMIS) valt onder het VLIZ Privacy beleid Top | Auteurs 
IMIS is ontwikkeld en wordt gehost door het VLIZ, voor meer informatie contacteer .